deck out
英 [dek aʊt]
美 [dek aʊt]
装饰; 打扮
柯林斯词典
- PHRASAL VERB 装饰;打扮
If a person or thingis decked out withorinsomething, they are decorated with it or wearing it, usually for a special occasion.- The cab was decked out with multi-coloured lights...
出租车上装饰了五颜六色的彩灯。 - She had decked him out from head to foot in expensive clothes.
她用昂贵的服装把他从头到脚打扮一新。
- The cab was decked out with multi-coloured lights...
英英释义
verb
- put on special clothes to appear particularly appealing and attractive
- She never dresses up, even when she goes to the opera
- The young girls were all fancied up for the party
双语例句
- Now that we've got a deck builder and something to help work out the odds of drawing specific cards, we can put together a really simple dealer to practice poker hands.
现在已经得到牌组构建器和一些工具,可以帮助计算出抽出特定卡的机率,我们可以整合一个真正简单的发牌器来进行发牌。 - We need all hands on deck to ride out this storm.
我们需要齐心协力地安全渡过这场灾难。 - Finally, the test model of composite steel-concrete bridge deck of Dongping Bridge is designed, and the test project is made out through finite element analysis for fact bridge and test model.
最后,设计了东平大桥钢&混凝土组合桥面板模型试验,并对实桥模型和试验模型进行了有限元分析,制定出试验方案; - When I embarked, I didn't look round the ship but went straight to the deck. I held the camera and waited for the ship to start out.
刚开始,我没有环顾游轮而是直接走到了甲板上,我拿着照相机等待着游轮驶出岸边。 - This paper mainly deals with the effects of passage velocity of vehicle and roughness of bridge deck on the dynamic increments of bridge response under the action of traffic loads, Field tests are carried out on a simply supported prestressed concrete bridge approach in Shandong Province, China.
本文对山东省东营胜利大桥跨度为30m的简支预应力混凝土引桥进行了桥梁动载试验,探讨车辆行驶速度和桥面不平对桥梁动态增量的影响。 - So, you know, here I am now, on the deck of Titanic, sitting in a submersible, and looking out at planks that look much like this, where I knew that the band had played.
这时我坐在潜艇中,位于铁达尼号甲板上方,看著就像是这样的甲板,也就是乐团最后在甲板上演奏的地方,然后我操纵著一台遥控载具通过走道。 - In the paper, the 3-dimension finite element model for bridge deck continuous simply-supported girder is established and model analysis is carried out with ANSYS.
本文以高架桥常见的结构形式桥面连续简支梁结构为例,建立三维有限元模型,进行了模态分析并与试验结果进行对比分析。 - But when the dripping Mouse had reached the deck it turned out not to be at all interested in the Sea People.
谁知湿淋淋的老鼠踏上甲板后,原来对海人竟丝毫不感兴趣。 - She had decked him out from head to foot in expensive clothes.
她用昂贵的服装把他从头到脚打扮一新。 - However, the study of bridge deck pavement in our country is carried out very late, and relevant study is less, especially the study aimed for the macro-span concrete bridge is even less.
然而,我国对于桥面铺装方面的研究开展得较晚,相关研究也较少,尤其是针对大跨径水泥混凝土桥的沥青混凝土桥面铺装的研究更少。
